Ok, Birthday weekend and I was able to spend lots of time on the right tank. Bekah helpled me riveting all 5 center ribs. I was able to get them in and get them all cleaned up. Filets on all edges and the inside rivet heads covered with dabs of sealant. I also got the outboard end rib in place in the tank and got it all cleaned up. This week I should have time to insert the vent line, finish the inner end rib, and work on the capacitive senders; getting everything ready to seal up with the rear baffle. Looking good so far, and liking the progress. I can see the light at the end of the tunnel; the end of working with the Black Death is in sight. ;-)
Oh, and look what Bekah gave me for the birthday ! ! Dynon Heated Pitot Tube with AOA !
No comments:
Post a Comment