I finished the day by wiring up the elevator trim tab and safety tying the hinge pin.
This site shows the years of construction, first flights, and the continued adventures of Chad and Bekah in our RV-7
Search This Blog
Saturday, December 29, 2012
Lighting and Emp Work
I finished the day by wiring up the elevator trim tab and safety tying the hinge pin.
Wednesday, December 26, 2012
A New Look
Friday, December 21, 2012
The Empennage goes back on
I also swapped my flag because I had it backwards. Who would have known there is a specific way
to hang a flag on a vertical wall, but I definitely want to make sure its hanging
correctly.
Don’t mind the clutter in the hangar, I haven’t got it fully
fitted out yet. ;-)
Sunday, December 16, 2012
Moved the plane to the Hangar
Once we got to the airport, the trailer is so low that we were able to roll the plane right out and right into the hangar. It wasn't the best weather rain, snow, wind.. but no worries with the enclosed trailer the RV was safe.
Thursday, December 13, 2012
Canopy fitting complete - Ready for the Move
Then it was onto getting the final fit of the rear window to Canopy. During construction I left both about 1/32 too long so that I could really nail the final fit after I riveted the front skin, which effects canopy forward aft location. Now that I am reasonably sure the canopy won’t move much, or at least that I can control its movement (with my forward stop mod I built in about a year ago) it was time to final fit this thing. Lots of sanding and the rear window was in and out about 6 times, but I finally zeroed in on it and got the canopy to close. I used a long straight sanding bar and am really surprised how accurate I got the fit between the canopy and window. Looking at it, the seam is extremely straight and uniform. I am a little shy of 1/16 inch gap so I might open it up a small bit more to allow for expansion etc.. Right now, I don’t even think water would drip through due to surface tension.
At this point with the lugs done and canopy/rear window fit,
the plane is ready to head to the
airport !
Tuesday, December 11, 2012
Canopy Final Fit
I have coordinated help with Trucks and Trailers to make the
big move this weekend ! Taking the RV
up to her permanent home at Paine Field ! Then it’s a lot of cold weather work to get
her ready for the summer. ;-)
Sunday, December 9, 2012
Canopy Fairing Continued, Continued, Complete !
One more round of epoxy and micro balloons followed by lots of sanding. Then a coat of high build primer also sanded smooth. No low spots, looks good, so I shot on a coat of two part epoxy primer. Looks great and is now sealed and will fly that way until final paint.
Time to call it good.
Friday, December 7, 2012
Canopy Fairing Continued, Continued
Another day of work on the canopy fairing. I sanded again for an hour and things are looking really good. Some minor low spots so it needs one or two more sessions before I can put some primer on it and call it good. Here is a shot of it after the sanding session, then another pic with another coating of dyed epoxy with Microballoons. I probably don't need to be using black dye anymore, but it looks good and I think it makes it easier to see low spots. Also, with the microbaloons I don't need to use the peel ply which also makes it easier to see low spots since they stay shiney. Each coat I am completely recoating the entire surface, as it seems to work better. Finallly I was really nervous about getting close to the tape, but its stronger than you think and I peal off the yellow each time leaving on the PVC tape which is underneath the yellow (the PVC tape is extreamly tough).
Thursday, December 6, 2012
Canopy Fairing Continued
Monday, December 3, 2012
Canopy windscreen fairing
From this point forward I have days and days of sanding/filling/sanding/filling/sanding/filling.. Until it looks amazing. ;-)
Sunday, December 2, 2012
Continued Progress - Started Canopy Fairing
I am starting to plan my move to the hangar now.. It won’t be long, but at the same time I am
trying to get every little thing done I can before making the move. Working from the cold hangar doesn't sound
too appealing in December… So I was
able to fit some seals up on the lower inlets of the lower cow. Using a .040 backing plate and some #6
screws, I cut the baffle material so that it would slide into place and block
the air from escaping forward around the lower baffle ramps. It turned out pretty good on both sides and doesn't make it any more difficult to mount the cowl.
After that I did some research and decided it was time to start building out the Canopy Fairing. Here I am venturing again into unknown territory. So I looked at a few other sites, read the directions that came with the kit and am just jumping in. The leading edge of my canopy fit across the lower skin very well, so I don’t need to use any rivets or pins to “lock it down”. Also, some people don’t do this without the canopy on the airplane, I am using a level surface, so am confident I won’t have any warp built into the canopy, but we’ll see.
I started by using some pipe tape (20mls thick) to draw the line where the canopy fairing will come up to.. Then with 40 grit sand paper, I scuffed the plexi and aluminum as much as possible, even under the lip where the fillet will go. Using standard west system epoxy I mixed in micro balloons to get it super thick and some black pigment since this will be visible from inside the cabin, I got it nice and black. I used a Popsicle stick and some finesse made the filet to fill the gap under the lip. This will be sanded down quite a bit before I got to the next steps of applying the fiberglass layups, but it shouldn't be difficult to stand since it has filler in it.
Then I wrapped the thing with peel ply sheets which is supposed to set the epoxy up to be easily sanded, or ready for the next coat of epoxy without sanding. This was mainly a test, I will be using the peel ply much more when it comes to the actual fiberglass lay ups.
Subscribe to:
Posts (Atom)